For more than a century, many urban waterways have gradually been asked to occupy less space while carrying more responsibility. Floodplains have been developed, tributaries piped or concreted, and channels straightened, dredged or confined. These interventions may accommodate growing cities, but over time they can fundamentally change how water, sediment and energy move through a catchment.
That tension is evident in a highly urbanised catchment in Queensland, where the waterway has experienced major bank erosion, sand deposition and asset damage, including during recent flooding in 2022 and 2025. Near-bankfull flows have become markedly more frequent since 2008, and LiDAR analysis points to substantial net sediment loss.
The question facing river managers is deceptively simple: where should we intervene if we want to reduce both flood and erosion risk? The modelling suggests there is no single answer.
The problems facing established urban waterways rarely begin with a single flood. In the Queensland catchment examined, development has progressively occupied much of the historical floodplain, while tributaries were piped or concreted and sections of the main waterway were straightened and rock-lined. The estuary itself shifted from a three-to-four-kilometre-wide, multi-channel floodplain in the mid-20th century to a single constructed channel.
The result is a waterway that has progressively lost space to spread out and dissipate energy.
Baseline hydraulic modelling highlighted what that means in practice. The steeper, confined reaches showed pronounced energy hotspots, particularly where urban development squeezes the channel and downstream of concrete tributaries. Where the channel reconnects with parkland floodplain, velocity, stream power and shear stress fall sharply as the flow is able to spread.
That observation raised an important question: if the catchment is already showing where additional room and roughness reduce energy, can those processes be deliberately used to manage risk?
Rather than moving directly to detailed design, management scenarios were built into the existing TUFLOW flood model and compared with the baseline condition.
The scenarios tested different approaches: increasing hydraulic roughness through catchment-wide riparian revegetation; reducing peak flows through stormwater management in different parts of the catchment; and creating more room for the river by lowering selected floodplain areas, both with grass and with dense vegetation coverage.
At this stage, the interventions were tested individually rather than together. The objective at this stage was not to design a final solution, but to understand the direction and relative scale of change each strategy could produce across the catchment.
That distinction matters. Catchment-scale modelling can help narrow the field before significant money is committed to individual interventions. It can show which levers have reach, which are highly localised and where solving one problem may simply change conditions somewhere else.
The clearest result was also perhaps the most important: no single intervention changed the hydraulics across the whole system.
Riparian revegetation had the broadest influence. Increasing roughness reduced bankfull velocity along most of the main waterway, with major reductions through several reaches. But the modelling also pointed to a trade-off. Greater roughness may increase deposition risk in lower-gradient sections, while shear stress can increase in parts of the channel even as vegetation strengthens the banks.
The stormwater scenarios produced a different result. Reducing peak flow by 10% in developed sub-catchments and 5% in partly developed areas had negligible effects at the modelled design-event scale. That does not necessarily mean source control is ineffective. Rather, it suggests that relatively small reductions in peak flow may have limited influence during large floods and that the value of source control needs to be tested against the more frequent flows that help shape the channel.
Giving the river more room through floodplain lowering was powerful, but local. It significantly reduced channel shear stress where it was applied, and vegetating the lowered floodplain slowed floodplain flows further, but it had little effect farther downstream.
Again, the result came with a trade-off.
Reconnecting the river with its floodplain means water moves into areas that may previously have remained dry or experienced lower-energy flows. In some locations, the modelling showed increased velocity or shear stress across the floodplain, introducing the possibility of new hotspots and flow paths. Vegetating the lowered floodplain slowed the flow but increased shear stress in places, so the treatment needs to suit the local setting.
Creating room for the river, therefore, is not simply about opening more space. Where that space is created, how it is treated and how the resulting floodplain is managed all matter.
Taken together, the scenarios point towards a different way of thinking about flood and erosion management in complex urban catchments.
Rather than searching for the single intervention that solves the problem, river managers can test packages of measures that work at different scales and address different parts of the system.
Catchment-wide revegetation may provide a relatively broad way to influence velocity and build roughness into the system. Strategic floodplain reconnection can then target particularly energetic reaches where there is suitable space. Source-control measures may play a greater role during the more frequent flows that contribute to erosion and channel change.
This also means looking beyond the design flood. Erosion and channel form respond to much more frequent events, and in parts of this catchment bankfull flows occur roughly once a year. A measure such as stormwater management that changes little in a major flood may still influence the smaller flows that cumulatively shape the waterway, so assessing only the largest design event risks overlooking that part of the system’s behaviour.
The next step is therefore not simply to choose the “winning” scenario. It is to test how these measures interact.
That includes modelling combined packages, such as floodplain lowering alongside catchment-wide revegetation; testing larger runoff reductions and sub-bankfull flows; linking the hydraulic modelling with a sediment budget to better understand downstream deposition; and monitoring early works so model predictions can be checked against what actually happens on the ground.
There are limits to what this kind of modelling can tell us.
The scenarios represent interventions relatively simply. Revegetation is modelled through changes in roughness. Stormwater management is represented as a fixed reduction in peak flow. Critical shear thresholds are high-level indicators that will vary locally, while shear stress alone does not capture the additional bank strength created by vegetation.
The results therefore show direction of change at catchment scale, not detailed site design.
Managing flood and erosion risk in established urban catchments requires an understanding of how the whole system responds, from hydrology and hydraulics to geomorphology, sediment movement and the condition of the floodplain. The modelling in this study demonstrates the value of bringing those perspectives together early, when there is still an opportunity to test different approaches and understand their potential trade-offs before progressing to detailed design.
For organisations considering nature-based solutions, floodplain reconnection or other approaches to managing flood and erosion risk, SLR can help test the options, understand the trade-offs and build the evidence, including monitoring how early works perform, needed to move from catchment-scale strategy towards practical intervention.
For established urban waterways, there is unlikely to be a single intervention capable of undoing decades of confinement and modification.
But by testing packages rather than single fixes, using roughness strategically, giving rivers more room where it can make a meaningful difference, and considering the frequent flows that actually shape channels, there is an opportunity to make better-informed decisions before committing to expensive pilots about where investment can have the greatest effect.
Sometimes reducing flood and erosion risk is less about controlling the river and more about understanding where to give it room to move.