Brennans Creek Dam - dam safety review

Client Name
Brennans Creek Dam
Location
New South Wales
Still reservoir with a sandstone rock bank and bushland beyond, seen from a concrete dam wall

Challenge

Our client required specialist engineering services to undertake dam safety works, including auditing, associated with the Brennans Creek Dam at the West Cliff Colliery.

Solution


SLR ensured the ongoing compliance of Brennans Creek Dam with Dam Safety NSW through the delivery of a comprehensive Dam Safety Review and Report, Geotechnical Assessment and Design Basis Report.

Impact

Our team provided the following services:

  • Geotechnical site investigations and report
  • Dam safety inspection
  • Seepage and slope stability assessment
  • Assessment of the risk of piping
  • Assessment of dam breach mechanism
  • Failure modes and effect analysis
  • Consequence category assessment
  • Dam safety report
  • Design report
  • Operation, Maintenance and Surveillance Manual, Trigger Action Response Plan and Dam Safety Emergency Plan update

Related projects

See all projects
  • Terraced benches of a large open-pit mine with haul roads
    Project

    Western Australia, Australia

    Argyle Diamond Mine (Rio Tinto)

    Mining

    Argyle diamond mine closure planning


    Read more
  • Open-cut coal mine pit with exposed seams and haul trucks on benches below a bright blue sky
    Project

    North-West Queensland, Australia

    Chinova Resources Pty Ltd

    Mining

    Osborne Mine and Cloncurry Project


    Read more
  • Close-up of stacked blue pipes with a bright orange glow at the centre
    Project

    Bowen Basin, Queensland, Australia

    BHP Billiton

    Government & Infrastructure

    Central Regional Water Network (CRWN) optimisation study


    Read more