EnviroServ Waste Management - Integrated Water and Wastewater Management Plan for the Holfontein Hazardous Waste Management Facility, Gauteng
20 April 2026 | Client: EnviroServ Waste Management (Pty) Ltd (“EWM”)
EWM operates the Holfontein Hazardous Waste Management Facility (HHWMF), located about 50 km east of Johannesburg in the Ekurhuleni Metropolitan Municipality, and approximately 2.9 km southeast of Etwatwa. The facility lies in the upper Blesbokspruit area within quaternary catchment C21D of the Vaal River Water Management Area, about 400 m from an unnamed tributary flowing into the Blesbokspruit. The HHWMF is a commercial Class A (formerly H:H) hazardous waste facility that has been operating since 1989 and owned/ operated by EWM since 1997. It currently operates under a Waste Management License (WML) (Reference No.: 12/9/11/L21083111621/3/R) issued by the Department of Forestry, Fisheries and the Environment (DFFE) in September 2021. As the licensed footprint is now fully utilised, EWM intends to expand operations through the Holfontein Expansion Project (HEP), which has an Environmental Authorisation obtained from the Gauteng Department of Agriculture, Rural Development and Environment (GDARDE) for the HEP (Reference No.: GAUT 002/23-24/E3829) in July 2024 in terms of the National Environmental Management Act (Act No. 107 of 1998), while the WML is currently under decision-making by the DFFE (Reference No.: 12/9/11/L231218161347/3/N). EWM now plans to submit an IWULA covering both the existing HHWMF and the proposed HEP for the relevant water uses (those not covered in the existing WML).
An Integrated Water and Waste Management Plan (IWWMP) has been prepared to equip the Department of Water and Sanitation (DWS) with a detailed and comprehensive overview of the project. The plan covers the current operations at the HHWMF as well as the proposed expansion of the HEP and serves as supporting documentation for the Water Use License application and related regulatory requirements.
SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed by EWM to manage the IWWMP process in support of the proposed Project.
Status
The draft IWWMP report is now available for a 60-day Public Participation Process (PPP) from 20 April 2026 to 22 June 2026. All comments received will be forwarded to DWS.
Please submit any comments, queries or objections to SLR via the contact details provided by 22 June 2026.
You are receiving this information because you are registered on SLR’s database of I&APs for this proposed Project. If you supply your contact details as a new I&AP, you will also be included in this database. It is assumed that as an I&AP for this proposed Project, you authorise SLR to retain and use your Personal Information as part of a contact database for this and/or other environmental authorisation related processes and that you confirm your acceptance for SLR to contact you regarding this processes.
SLR will not process your Personal Information other than as permitted or required by environmental authorisation processes or as required by law or public policy. SLR will use reasonable, appropriate security safeguards in order to protect Personal Information and to reasonably prevent any damage to, loss of, or unauthorised access or disclosure of Personal Information, other than as required for environmental authorisation processes or as required by any Law or public policy. You may request for your Personal Information to be deleted from the I&AP database at any time by contacting SLR.
Draft IWWMP Report for Public Review and Comment
Appendix A - Permit Approvals: WML (Existing and Historical), EA, Other
Appendix B - Title Deeds
Appendix C - Pre-application Record
Appendix D1 - Design Approvals
Appendix D3 - Engineering Report
Appendix E - Hydrogeological Impact Assessment
Appendix F - Hydrological Water Assessment including Water Balance and Stormwater Management Plan
- F1 - February 2026 - HEP - Surface Water Specialist
- F2 - November 2021 - HHWMF - Stormwater Infrastructure - Master Plan
- F3 - November 2021 - Technical Note - Water Balance
- F4 - November 2021 - Technical Note - Outer Stormwater Dam
- F5 - November 2021 - HHWMF - Stormwater Management Plan
- F6 - July 2021 - HHWMF - Liquid Management Model Update
Appendix G - Monitoring Protocol and Reports
Appendix H - Freshwater Ecosystem Assessment
Appendix I - Hydropedological Assessment
Appendix J - Environmental Management Programme
Appendix K - Emergency Response Plan
Appendix L - Public Participation Summary Report
Appendix M - Master Layout Plan
Appendix N - Existing Registrations
Appendix O - Proof of Payment of Application Fee
Appendix P - Basic Assessment Report
- Appendix P - 2024 - HEP BAR
- BAR Appendix A - Site Plan
- BAR Appendix B - Photographs
- BAR Appendix C - Facility Illustrations
- BAR Appendix D - Route position information NA
- BAR Appendix E1 - BID, NTS, Advert, site notice
- BAR Appendix E2 - Proof of site notice and Newspaper advert
- BAR Appendix E3 - Comments and Responses Report
- BAR Appendix E4 - I&AP database - Not available for Public Review
- BAR Appendix F - WML, SAHRA and Service Letters
- BAR Appendix G1 - Air Quality Report
- BAR Appendix G2 - Climate Change Report
- BAR Appendix G3 - Surface Water Report
- BAR Appendix G4 - Groundwater Report
- BAR Appendix G5 - Soil Report
- BAR Appendix G6 - Terrestrial ecology report Part A
- BAR Appendix G6 - Freshwater ecology report part B
- BAR Appendix G6 - Terrestrial Ecology Report Part C
- BAR Appendix G7 - Freshwater Ecology Report
- BAR Appendix G8 - Hydropedology Report
- BAR Appendix G9 - Socio economic report
- BAR Appendix G10 - Community Health Report
- BAR Appendix G11 - Cultural Heritage Report
- BAR Appendix G12 - Paleontology Report
- BAR Appendix G13 - Noise Report
- BAR Appendix G14 - Traffic Report
- BAR Appendix G15 - Visual Report
- BAR Appendix H - Environmental Management Programme
- BAR Appendix I - GDARD Final BAR
- BAR Appendix J - Need and Desirability
- BAR Appendix K - EAP Certification - Not Available for Public Review
- BAR Appendix L - CVs of Environmental Team - Not Available for Public Review
- BAR Appendix M - DFFE Screening Tool
- BAR Appendix N - Preliminary Design Report (see Appendix D3 of IWWMP)